News/Seminar
12.23.2024: The CMtO will be closed beginning at 5:00 PM on Monday, December 23 and remain closed until Thursday, January 2, 2025 in observance of the UIUC Winter Break.
11.25.2024: The CMtO will be closed beginning at 12:00 PM (noon) on Wednesday, November 27 - Friday, November 29, in observance of the Thanksgiving holiday.
08.16.2023: The Blue laser (488 nm) in the ERML Symphony A1 has been replaced. The instrument is up and running.
08.14.2023: The 488 nm laser in the ERML Symphony A1 is down and needs to be replaced. Service has been requested. Please use the Symphony A1 and Fortessa located in 264 RAL and 2117A Everitt Laboratory, respectively.
08.01.2023: RAL Symphony has Symphony has been repaired.
07.27.2023: RAL Symphony has pressure issues. Service requested. The instrument is still available for use at medium flow rate.
07.20.2023: The Becton and Dickinson (BD) 3-laser LSR II Flow Cytometry analyzer was traded in for a new 4-laser BD Symphony A1 analyzer and will be decontaminated, decommissioned, and picked up by BD in the second week of August 2023.
05.26.2023: ERML Symphony has been repaired. The system is operational and calibrated.
05.19.2023: ERML Symphony is still not connecting correctly. Please do not plan to use until we post that it is available.